NOSTOS
SHORE STATION
VESSEL
CSD PENELOPE
UPLINK 214 MS
AUTHORITY · SHORE
JOB
AMBROSE CHANNEL · REACH 4 · STA 41+220
--:--:--
3D VIEW UNAVAILABLE — WEBGL / CDN NOT REACHABLE
BASEMAP UNAVAILABLE — VECTOR CHART ONLY
DREDGE PLANT
–
×
PRODUCTION
2,140
YD³/H
SLURRY DENSITY
1.36
SG
LINE VELOCITY
16.8
FT/S
SUCTION VACUUM
17.2
INHG
DISCHARGE PRESS
147
PSI
CUTTER TORQUE
62
%
SWING WIRE TENSION
P
7.4
S
3.2
T
DEPTH & GRADE
–
×
SOUNDING AT CUTTER
−44.3 FT
LADDER DEPTH
−46.4 FT
DESIGN PAYLINE
−48.0 FT
ALLOWABLE OVERDREDGE
−50.0 FT
CUT REMAINING
3.7 FT
TIDE (MLLW)
+1.2 FT
CUT / FILL vs DESIGN −48.0 FT
CUT PROFILE — SWING AXIS
–
×
MLLW 0.0
PAYLINE −48.0
OD LIMIT −50.0
LEVERMAN STATION
–
×
AUTO SWING
AUTO DEPTH
SWING SPEED
27 FT/MIN
LADDER DEPTH
−48.3 FT
CUTTER SPEED
30 RPM
DREDGE PUMP
82 %
DENSITY TARGET
1.38 SG
◀ PORT
HOLD
STBD ▶
STEP AHEAD 3 FT
SWAP SPUD
GIVE CONTROL TO VESSEL
PRODUCTION
–
×
41,200
EFFECTIVE YD³ / CALENDAR DAY
SHIFT TOTAL
6,420 YD³
OVERDREDGE
3.8 %
PAY RATIO
96.2 %
PASSES COMPLETE
23
OPERATING FACTOR — 24 H
■ PUMPING
76
%
IDLE & MOVES
16
%
DOWN
8
%
EVENT LOG
–
×
SCENARIOS
–
×
MATERIAL CHANGE
Medium sand → stiff clay. Inference from torque + vacuum, ahead of density.
DROP UPLINK
Starlink + cellular out. Onboard controller keeps the line above critical velocity.
LINE PLUG RISK
Density excursion, velocity below critical. Automatic clear-water flush.
RECENTRE CHART
Refit chart to the Reach 4 work area.
CHART — AMBROSE CHANNEL
–
×
ELEV
CUT/FILL
WATER
PAYLINE
−20 FT
−56
PLANT
DEPTH
PROFILE
LEVERS
PRODUCTION
LOG
CHART
SCENARIOS
3D · DRAG ROTATE · WHEEL ZOOM